European-Style 1500 kVA / 33 kV Compact Box Substation
- Rated Capacity: 1500 kVA
- Rated Voltage: 33 kV
- Frequency: 50 / 60 Hz
Shanghai Millenium Industry Co., Ltd.
Shanghai manufacturer of transformers, switchgear, compact substations and battery energy storage systems, engineered to IEC, ANSI/IEEE, GB and GOST standards and shipped to projects in 40+ countries.
Product lines
Every unit is engineered and assembled under our own roof, so capacity, voltage ratio, vector group, conductor metal, insulation class, ingress protection and cooling are all open to change.
Why buyers work with Millenium
We wind, cast, tank, wire and test in a 25,000 m² plant in the Lin-gang Special Area of the Shanghai Free Trade Zone — and we welcome you or your inspector on the test floor.
About us
Millenium — Shanghai Millenium Industry Co., Ltd. — builds transformers, switchgear, compact substations and battery storage systems for utility, industrial, commercial and renewable projects across more than 40 countries. The line reaches from 5 kVA distribution units to 31,500 kVA power transformers, and from 40 kWh storage cabinets to 10 MWh liquid-cooled containers, each engineered to IEC, ANSI/IEEE, GB or GOST and backed by ISO 9001, ISO 14001 and ISO 45001 certified production plus CE, UDEM and EAC approvals.
Every unit is made to order — to your grid, your site and your specification.
Factory & quality
CNC copper winding, vacuum resin casting, vapour-phase drying, in-house sheet-metal work and powder coating, and separate assembly lines for transformers, switchgear, compact substations and storage systems.
Winding resistance, turns ratio, insulation resistance, no-load and load loss, applied and induced withstand voltage and partial discharge — before anything is crated.
Temperature-rise and dielectric type tests where a project calls for them; storage systems add cell grading, BMS checks, leak tests and a full charge/discharge run.
Customers and third-party inspectors are welcome at factory acceptance tests (FAT). Documentation packs and type-test reports are prepared on request.
Shrink-wrapped, palletised or packed in fumigation-free wooden crates, with IEC, ANSI/IEEE, GB or GOST-compliant variants for every regulatory region.
Featured products
Projects
From a commissioned 33 kV/11 kV substation in Nairobi to representative configurations for solar, wind, mining, microgrid and storage projects on five continents.
33 kV prefabricated step-up substation — Wind-power collection system. 33 kV collector system; step-up ratio fixed against the grid connection point…
Read the project sheet →
2 MWh liquid-cooled containerized battery energy storage system with PCS and transformer — Industrial renewable-energy integration, peak shaving and…
Read the project sheet →
33 kV/11 kV distribution substation — transformer, RMU, LV switchgear, power distribution cabinets and related accessories — Urban and peri-urban…
Read the project sheet →Frequently asked questions
A manufacturer. Shanghai Millenium Industry Co., Ltd. winds, casts, tanks, wires and tests its transformers, switchgear, compact substations and energy storage systems in its own 25,000 m² plant in the Lin-gang Special Area of the Shanghai Free Trade Zone, with more than 200 staff and over 30 design and test engineers.
Designs follow IEC 60076 and IEC 62271 as standard, with ANSI/IEEE, GB and GOST variants. Production is certified to ISO 9001, ISO 14001 and ISO 45001; products carry CE type approval (ECM), UDEM technical inspection attestation to EN 62271-1 and EN 60076-1, an EAC declaration of conformity and CQC approval.
One unit. Every product is built to order — a single 100 kVA transformer or a 10 MWh storage plant — and quoted individually.
Rated power, HV and LV voltages, frequency, standard (IEC, ANSI/IEEE or GOST), vector group or phase, quantity, site conditions and the destination port. A single-line diagram or an existing spec sheet is ideal; if details are missing, an engineer will ask.
Typical lead times are 25–45 days for distribution transformers and switchgear, 45–75 days for power transformers and compact substations, and 45–90 days for energy storage systems, plus sea freight. Exact dates are confirmed with the quotation.
Yes. Customers and third-party inspectors (for example SGS, TÜV or Bureau Veritas) are welcome at factory acceptance tests; routine test reports and type-test reports are provided with the shipping documents.
Guides
Guide to IEC 60076 transformer FAT: routine and type tests, acceptance tolerances, documentation, and how to arrange witness testing.
· 9 min read
Compare RMUs and metal-clad KYN28 switchgear on IEC 62271-200 classes, fault levels, extensibility, protection and cost.
· 9 min read
Compares European three-compartment compact substations with American pad-mounted transformers on footprint, cost, maintenance and application fit.
· 8 min readSend a single-line diagram or a rough spec. An engineer replies with a technical proposal and quotation, usually within one working day.